Authors: Carl E. Zipper, Extension Specialist, Department of Crop and Soil Environmental Sciences, and Associate Director, Powell River Project, Virginia Tech; and Steven Winter, Professional Engineer, Schnabel Engineering Associates, Blacksburg, Virginia
Publication Number 460-130, Posted July 1997
Figure 4. Estimated Settlement of Unsaturated Mine Fill vs. Time, Beginning One Year after Mining
Return to the Case Study: Fill Stabilization of the Red Onion Maximum-Security Prison Site section of Stabilizing Reclaimed Mines to Support Buildings and Development.